MalaysiaTenders notice for AIR CONNECTION SYSTEMS AND RELATED MECHANICAL SYSTEMS TO PREPARE THE WORK BREAKDOWN OF THE FACULTY OF TECHNICAL & VOCATIONAL EDUCATION (FPTV), SULTAN IDRIS EDUCATION UNIVERSITY (UPSI), TELUK INTAN CAMPUS, PERAK DARUL RIDZUAN. The reference ID of the tender is 116042460 and it is closing on 30 Apr 2025.
If you are registered member, kindly login to view full details of this tender notice:
CLICK HERE TO LOGINAIR CONNECTION SYSTEMS AND RELATED MECHANICAL SYSTEMS TO PREPARE THE WORK BREAKDOWN OF THE FACULTY OF TECHNICAL & VOCATIONAL EDUCATION (FPTV), SULTAN IDRIS EDUCATION UNIVERSITY (UPSI), TELUK INTAN CAMPUS, PERAK DARUL RIDZUAN - Malaysia Tender
The RAYA MINISTRY OF LABOR, a Government sector organization in Malaysia, has announced a new tender for AIR CONNECTION SYSTEMS AND RELATED MECHANICAL SYSTEMS TO PREPARE THE WORK BREAKDOWN OF THE FACULTY OF TECHNICAL & VOCATIONAL EDUCATION (FPTV), SULTAN IDRIS EDUCATION UNIVERSITY (UPSI), TELUK INTAN CAMPUS, PERAK DARUL RIDZUAN. This tender is published on MalaysiaTenders under MYT Ref No: 116042460 and is categorized as a Tender. Interested and eligible suppliers are invited to participate by reviewing the tender documents and submitting their bids before the deadline on 2025-04-30.
The estimated tender value is Refer Document, and full details, including technical specifications and submission requirements, are provided in the official tender documents. Ensure all submissions meet the criteria outlined to be considered for evaluation.
Fresh and verified Tenders from Malaysia. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.
Fill out the form below and you will receive a call from us within 24 hours.
Get FREE SAMPLE TENDERS from Malaysia in your email inbox.
Copyright © 2014-2026 MalaysiaTenders.com. All Rights Reserved.